Terminology

Glossary of fluid power and control engineering

Short, precise definitions with the relevant standards.

5/2-way valve (ISO 1219-1)
Five ports, two switching positions. Standard power valve for double-acting cylinders.
Impulse valve
Double-pilot or double-solenoid valve without spring: keeps its position after the signal (memory).
Port numbering (ISO 5599-3)
1 supply, 2 and 4 working lines, 3 and 5 exhaust, 12 and 14 pilot ports (14 connects 1 → 4).
Designation (ISO 1219-2)
1A1 actuator, 1V1 power valve, 1S1 signal element, 0Z1 service unit — the first digit is the control chain.
Normally closed (NC)
In the rest position the supply is blocked; actuation opens the flow path. Contacts: 11-12.
Normally open (NO) (EN 60947)
In the rest position the path is open. Contacts: 13-14 (and 23-24, 33-34…).
Meter-out control
Throttling the exhaust air of a cylinder for smooth, load-independent speed.
Two-pressure valve (AND)
Output only when both inputs are pressurised — used for two-hand safety.
Shuttle valve (OR)
Output when either input is pressurised; it prevents back-flow to the other input.
Displacement-step diagram (VDI 3260)
Plots each cylinder position against the steps of the cycle; the starting point of every design.
Signal overlap
A trigger signal is still present when the opposite movement is required — the valve is blocked.
Blocking signal
The signal that causes a signal overlap: it holds one pilot of an impulse valve while the opposite pilot must switch it. Removed by shortening it (idle return roller, pulse valve) or by switching it off (cascade, stepping chain).
Idle return roller
One-way roller lever valve: the cam actuates it only while travelling towards its end position, giving a short pulse; the other way the lever folds away.
Cascade
Group lines supplied in turn so that only the signals of the active group carry air.
Stepper module (TAA / TAB)
Pneumatic step: memory + AND + OR in one module. TAB is the initial step.
Quickstepper
Pneumatic sequencer with consecutive steps, outputs A1… and conditions X1….
GRAFCET (IEC 60848)
Graphical specification of sequential control: steps, transitions, actions.
Self-holding
A relay keeps itself energised through its own NO contact after a momentary start signal.
On-delay / off-delay (IEC 61812)
On-delay switches t after energising; off-delay switches back t after de-energising.
Current path (EN 61082)
Numbered vertical path between the +24 V and 0 V rails in an electrical diagram.