Off-grid solar photovoltaic systems
Off-grid solar PV systems, designed and simulated in 3D
Place PV modules in the array field, mount the charge controller, inverter and protection on the plant-room wall, set the batteries on the floor and wire them: the simulator runs your system in 15-minute steps over three days with the real climate of the chosen city and month, and shows where energy is lost.

What the simulation covers
Modules in series and parallel
Open-circuit voltage on cold mornings, operating voltage and current of each string, tilt and orientation towards the equator, mismatch between strings.
MPPT and PWM controllers
An MPPT controller tracks the maximum power point; a PWM controller pulls the array down to the battery voltage. See the energy each one harvests and wastes.
Battery banks
AGM and LiFePO4 batteries in series and parallel, state of charge, depth of discharge limits and the effect of mixing models in one bank.
Inverter and loads
Pure sine wave inverters with continuous and peak power, motor start-up surges and a list of household and health-post loads with their daily schedules.
Protection and cabling
gPV string fuses (IEC 60269-6), type 2 PV surge protective devices with earthing, DC fuses matched to the cable, an AC MCB and a 30 mA RCD; cable current capacity and voltage drop.
Climate data
Monthly irradiation and temperature from NASA POWER (2001–2025 climatology) for 36 cities on six continents.
Equipment library (14 items)
Generation
- PV module — Monocrystalline solar module with junction box and MC4 connectors (+ red, − black). Connect in series to add voltages and in parallel to add currents.
Storage
- Battery — Deep-cycle battery. In series the voltages add (12 → 24 → 48 V); in parallel the capacities add. Do not mix types or capacities.
Control and conversion
- Charge controller — Charges the batteries from the modules. MPPT tracks the maximum power point and accepts high module voltages; PWM connects the modules directly to the battery.
- Pure sine wave inverter — Converts the battery DC voltage into 230 V AC. The DC input must match the bank voltage; it withstands twice its rated power while motors start.
Protection, connections and earthing
- DC fuse / circuit breaker — Protects the battery cable against short circuits. Choose a rating above the circuit's maximum current and below the cable's current-carrying capacity.
- PV DC isolator — Switch that disconnects the modules from the controller for maintenance. Click to open and close it.
- DC combiner box (2 strings) — IP65 enclosure that joins two strings in parallel: a gPV fuse in each string (IEC 60269-6), a type 2 PV surge protective device (EN 50539-11) connected to earth, and cable glands underneath. IEC 62548 requires string fuses from 3 strings in parallel.
- DC busbars + / − — Insulated copper busbars with red and black covers, to connect several batteries, the controller and the inverter at one point (cables of equal length to each battery).
- Battery monitor (shunt) — 500 A / 50 mV shunt on the bank negative with a monitor: voltage, current, state of charge and time remaining. The whole system negative passes through it (battery on one side, controller and inverter on the other).
- Earth bar and electrode — Main earthing bar connected to a copper earth rod driven into the ground (≥ 1.5 m). Connect the PE of the surge protective devices, the mounting structures and the board here (IEC 60364-5-54, IEC 62548).
- 2-pole MCB (AC output) — 2-pole curve C circuit breaker (IEC 60898-1) at the inverter output: protects the cable to the board. It trips on overload; click to switch it on or off.
- 2-pole 30 mA RCD — High-sensitivity residual current device (IEC 61008) on the AC output: protects people against indirect contact. Click to switch it on or off.
Loads
- 230 V load distribution board — Supplies the appliances in the load list (Loads button). Connect L and N to the inverter output.
- LED lamp 12 V — DC lighting connected to the controller's LOAD output (it switches off when the battery runs low).
10 graded challenges
Each challenge fixes the location, month, weather and loads. The check copies your system, simulates three consecutive days and verifies connections, protection, cables and energy supply.
- First 12 V solar kit (Installation, level 1, Dar es Salaam, June) — Light a house with three 12 V LED lamps (18:00 to 23:00) connected to the controller's LOAD output. Use one module, a PWM controller and a 12 V battery. Protect the battery with a fuse.
- Four modules on a 100 V MPPT (Sizing, level 2, Johannesburg, July) — Connect four 330 W modules to a 100 V / 40 A MPPT controller charging a 24 V bank. Mind the open-circuit voltage on Johannesburg's cold winter mornings: choose the right series/parallel arrangement.
- 24 V 200 Ah battery bank (Installation, level 2, Lusaka, July) — With four 12 V 100 Ah AGM batteries, build a 24 V 200 Ah bank (two in series, two strings in parallel). 24 V controller and inverter.
- Rural home near Nairobi (Design, level 3, Nairobi, June) — A family near Nairobi wants lighting, television, phone charging and a chest freezer (loads already defined). Size the system for the month with the least sun, without outages and without discharging the battery too deeply.
- Water pump in Namibia (Design, level 3, Windhoek, June) — A 750 W pump fills the storage tank every morning (07:00 to 08:00). At start-up the motor draws three times its rated power. Choose the right inverter and battery bank.
- Rural health post in Zambia (Design, level 4, Lusaka, June, 3 overcast days) — The vaccine refrigerator must never stop. Get through three consecutive overcast days in the month with the least sun, without outages and without damaging the batteries.
- Recover the lost energy (Troubleshooting, level 2, Dar es Salaam, April) — This house has outages at night, even though it has two 330 W modules. The controller is PWM and the modules have 60 cells. Fix the system so that it makes use of the module energy.
- Troubleshooting: the system does not charge (Troubleshooting, level 2, Lusaka, July) — The previous technician left the system working badly: the batteries barely charge and protection is missing. Measure with the multimeter, find the faults and correct them.
- 2000 W inverter: cables and voltage (Sizing, level 3, Dar es Salaam, October) — In a computer room, the 2000 W inverter is connected at 12 V with 6 mm² cable. Make the installation safe and efficient: voltage drop up to 3 % and matched cables and fuses (you may increase the cross-section or move the system to 24 V).
- Installation to the standards (Design, level 4, Nairobi, June) — Install the Nairobi home system as on a real job: a DC combiner box with correctly rated string fuses and an earthed surge protective device, DC busbars, a battery monitor on the negative and, at the inverter output, an MCB and a 30 mA RCD before the board.
Example systems
First 12 V kit · Rural home near Nairobi · Complete professional installation · 24 V bank · 2S2P array on an MPPT · Water pump · Health post
Locations
Nairobi (Kenya), Dar es Salaam (Tanzania), Lusaka (Zambia), Johannesburg (South Africa), Cape Town (South Africa), Windhoek (Namibia), Kinshasa (DR Congo), Lagos (Nigeria), Accra (Ghana), Dakar (Senegal), Addis Ababa (Ethiopia), Cairo (Egypt), Casablanca (Morocco), Lisbon (Portugal), Madrid (Spain), Rome (Italy), Athens (Greece), Berlin (Germany), London (United Kingdom), Dubai (United Arab Emirates), Riyadh (Saudi Arabia), New Delhi (India), Mumbai (India), Dhaka (Bangladesh), Bangkok (Thailand), Manila (Philippines), Jakarta (Indonesia), Sydney (Australia), Alice Springs (Australia), Mexico City (Mexico), Phoenix (United States), Miami (United States), Bogotá (Colombia), Lima (Peru), São Paulo (Brazil), Santiago (Chile).

Frequently asked questions
Where does the solar data come from?
From the NASA POWER climatology (2001–2025): monthly mean global horizontal irradiation and air temperature for 36 cities.
Which standards are used for protection?
String fuses and surge protection follow IEC 62548 and IEC 60269-6 / EN 50539-11; the AC output is protected by an IEC 60898-1 circuit breaker and an IEC 61008 30 mA residual current device.
Can I see how much energy is wasted?
Yes. The three-day simulation reports the energy available from the modules, the energy harvested, the energy wasted when the batteries are full, the energy consumed, the hours without supply and the minimum state of charge.